Services coordination and pipework

Case study

West Kensington

Heatfix designed and installed the heating, MVHR, air conditioning and electrical installation, and coordinated lighting, Crestron, Lutron and Control4 home automation.

Project context

Another proof point for serious whole-services coordination.

West Kensington should be presented as an integrated services project, not a heating-only job. Heatfix designed and installed the heating, MVHR, air conditioning and electrical installation.

Heatfix also acted as the main coordinating contractor for lighting, Crestron, Lutron controls and Control4 home automation, giving the project one services lead across comfort, electrics and control.

LocationWest Kensington
Heatfix scopeHeating, MVHR, air conditioning and electrical installation
CoordinationLighting, Crestron, Lutron and Control4 home automation

Integrated delivery

Designed, installed and coordinated as one complete services package.

01

Core services

Heating, MVHR, air conditioning and electrical installation designed and installed by Heatfix.

02

Smart systems

Lighting, Crestron, Lutron controls and Control4 home automation coordinated through the project.

03

Main coordination

Heatfix acted as the main coordinating contractor so services decisions were aligned before they affected the finish.

Project film

West Kensington on Instagram.

Instagram embeds can be slow or blocked by browser privacy settings. The direct reel link is kept visible as a fallback.

Case-study detail

Why this matters for London refurbishment projects.

West Kensington is another useful proof point for projects where the client does not want separate heating, electrical, ventilation and controls conversations drifting apart.

01

One services lead

Heatfix can reduce friction by keeping heating, MVHR, air conditioning, electrical and controls decisions aligned.

02

Smart-home coordination

Lighting, Crestron, Lutron and Control4 coordination needs practical services input before walls, ceilings and joinery are closed.

03

Finished-room protection

The point of good MEP work is that the finished rooms feel calm, controlled and properly considered.

Planning a similar project?

Send the drawings, photos and services constraints.

Heatfix can review heating, MVHR, air conditioning, electrical installation, lighting coordination, smart-home controls, plant space and services routes before decisions are locked in.