Heating, Heat Pump & Plant Room Projects | Heatfix

Project evidence

Projects and workmanship with real technical substance.

Prospective clients need to see the work, understand the constraints and believe the system will be installed, commissioned and maintained properly.

Heatfix Services LtdResidential and commercial building servicesLondon, Dorset and the South EastHeating, hot water, plant and controls
Commercial project

Pure Gym, Chiswick — commercial heat pump and hydronic heating installation.

A commercial heating and hot-water plant installation in West London, using Mitsubishi Ecodan air-source heat pumps, copper distribution, variable-speed pumps, expansion equipment and plant-room pipework.

  • Mitsubishi Ecodan air-source heat pumps
  • Grundfos ALPHA2 and Magna3 circulator pumps
  • Varem expansion and Afriso components
  • Flowrite isolation valves and copper distribution
  • Coordinated first-fix pipework in plant and wet areas
Mitsubishi Ecodan heat pump and copper pipeworkInsulated piping and Grundfos Magna3 pump
Residential project

West Kensington — high-end residential refurbishment.

A residential refurbishment example showing the type of private-home environment where coordination, clean workmanship and careful sequencing matter. This should become a fuller case study with approved project details, plant-room photography and measurable system information.

Open case study

Gallery

Workmanship details clients can inspect.

DAB variable speed booster sets

Plant equipment

Clear equipment presentation matters for operation, access and maintenance.

Copper pipe network and manifold

Pipework coordination

Pipe routes need to be thought through before finishes and access are fixed.

Copper pipe rough-in with valves

First-fix discipline

Good hidden work is part of the finished result, even when clients never see it again.